Al Oakes Award of Excellence

The AL OAKES AWARD OF EXCELLENCE was established in memory of Past-President Al Oakes, in recognition of his outstanding contributions to the Ottawa Valley Chapter of ASHRAE.

*In the 2014-2015 Chapter Year, this award was renamed as the BAKER-OAKES AWARD OF EXCELLENCE, to also recognize the contributions of Past-President Paul Baker to the Chapter.

The award is presented to acknowledge a member's dedication and service to the chapter.

2016-2017* Steve Moons 2015-2016* Roderic Potter
2014-2015* Aaron Dobson 2013-2014 Joel Primeau
2012-2013 Patrick Albert 2011-2012 Mike Swayne
2010-2011 Chris Frauley & Barry Riddell 2009-2010 -
2008-2009 Stephen Lynch 2007-2008 Jason Alexander
2006-2007 - 2005-2006 Imtee Baksh
2004-2005 - 2003-2004 Cynthia Gillis
2002-2003 Tony Doyon 2001-2002 Glenn MacLean
2000-2001 Robert Lefebvre 1999-2000 Cathy Godin
1998-1999 Robert Kilpatrick 1997-1998 Frank Bann
1996-1997 Chris Healey 1995-1996 -
1994-1995 Marc Carriere 1993-1994 Paul Seguin
1992-1993 - 1991-1992 Frank Vaculik
1990-1991 Jim Gregory 1989-1990 Don McKeen
1988-1989 Frank Tipper 1987-1988 Dalton McIntyre
1986-1987 Ray Young 1985-1986 Keith Murfin
1984-1985 Paul Baker 1983-1984 George Carscallen

Chapter Technology Awards

I
Commercial Buildings - New
I
Commercial Buildings - Existing
1st Place
Kashyap Desai, P.Eng
Stantec

For the Yardmen Arena chiller plant upgrade in Belleville.

The key features/modifications for the Chiller plant upgrade included:

  • One (1) 120 Tons High Efficiency air cooled chiller (In place of an existing 270 Tons Chiller)
  • Four (4) Calmac Ice Storage Tanks
  • Three new (3) VFD pumps.
  • New 2-way pressure independent Control Valves in the chilled water distribution
  • New piping, valves and accessories for a series, parallel and combination chiller plant operation.
  • Integrated chiller plant master EMCS including control valves, metering, control devices etc.
  • Demand response arrangement with a 3.5 cents/kWh OFF PEAK rate.

II
Institutional Buildings - New
II
Institutional Buildings - Existing
III
Health Care Facilities - New
III
Health Care Facilities - Existing
IV
Industrial Facilities or Processes - New
IV
Industrial Facilities or Processes - Existing
V
Public Assembly Buildings - New
V
Public Assembly Buildings - Existing
VI
Residential Buildings - New
1st Place
Andrew MacDonald
NORR

For the redevelopment of Beaver Barracks on 424 Metcalfe.

The key features to the redevelopment included:

  • Energy efficient lighting (30% of the MNECB values)
  • A central energy recovery ventilator
  • High performance building envelope (R30 roof and R20 walls)
  • Low flow faucets reducing domestic hot water usage
  • Water-source heat pump system in the building allowing recovery of heat during times of coincident heating and cooling demand, and allowing lower water temperatures for distribution to the suites
  • A central ground source heat pump plant to utilize geothermal energy for space heating and domestic hot water 
    preheating.
VI
Residential Buildings - Existing
VII
Alternative and/or Renewable Energy Use